In the last fiscal year alone, India has added a record-breaking solar capacity of over 30GW. However, there remains a significant gap between the capacity and actual generation.
Solving the “Evening Peak” problem is a must to achieve a truly green grid. Though solar power is abundant at noon, its demand peaks when the sun goes down.
One of the major issues the industry is currently facing is that the speed of solar installation has outpaced the development of transmission infrastructure needed to move that power.
The distribution Companies (DISCOM’s) have been one of the weakest links in the chain.
The 2026 USA-Iran War has placed solar encapsulant manufacturers in a unique and challenging situation. While the war has supercharged the demand for solar energy as a path to national security, it has simultaneously crippled the supply chain for the chemical polymers required to build solar modules.